Correct setup for twin screw extruders
When using a twin-screw extruder, the twin-screw extruder needs to install the device correctly, so that it can save energy and time during production.
The twin-screw extruder is fully automated from batching, extrusion, puffing, molding, core sandwiching, cutting, spraying to finished products at one time. The production line has the characteristics of many optional models, flexible equipment configuration, wide range of raw materials, many types of products, and simple operation. Selecting the appropriate configuration can produce sandwich cakes, sandwich rolls, puffed rice crackers, barley, rice crackers, nutritious breakfast, modified starch and other products, suitable for all kinds of food manufacturers.
Twin-screw extruder is a high-efficiency, high-performance food production machinery. In order for the newly purchased machinery and equipment to be able to produce stably and efficiently, the correct device is very important.
1. Before installing the twin-screw extruder, you should read the equipment manual carefully to understand the structure, dimensions and position of the hoisting force point of the equipment.
2. Correct methods should be taken when the equipment is hoisted and transported to avoid damage to the equipment, such as when the equipment is installed on the floor. The belt guard and belt should be removed first, and the puffing chamber must not be lifted, so as not to damage the important working parts of the equipment.
3. The ground or support of the device is firm and level, and can accept the working conditions of the machine under full load, otherwise it will affect the performance.
4. The feeder and conditioner can be directly fixed on the extruder host with bolts, and the outlet of the conditioner should be consistent with the feed port on the extruder.
5. The connection and installation of steam pipes shall be carried out in strict accordance with local regulations, and the steam pipes shall be sealed and insulated
6. For installation, there should be enough space around to facilitate operation, maintenance and maintenance, and the installation environment should pay attention to ventilation.
7. The connection buckets at the upper and lower interfaces should be flat and smooth to facilitate the flow of materials.
8. After the water supply and steam pipeline installation is completed, the pipeline should be completely cleaned to prevent the residue in the pipeline from blocking the valve or pipe fittings.
9. The installation position of the on-site control cabinet should be suitable, which is convenient for production operation and equipment maintenance and maintenance.
Jinan DAYI Machinery Technology Co., Ltd. is located in the beautiful city of Jinan. The company has been engaged in the research and development of food production line machinery and production technology for a long time, the company's standard production technology, the operation concept of automatic control, and the focus on the development of stable and reliable production equipment. The company's designers have long-term experience in design, development, debugging and production, and have responsible on-site engineering personnel engaged in production and debugging work, and can provide you with standardized design, production, and debugging processes.